Even though we had 2 experienced operators, they have to demonstrate that they have the skills to reach the high standards required to qualify for the ALLMI Operator Qualification. Here the delegate demonstrates that he has control & smooth use of the Fassi 66 tonne/metre machine – capable of lifting 16,000kgs @ 3.4 metres. Once he has demonstrated this a couple of times. We move onto bigger loads!!!!!!
Touchdown……excellent! The “tag-line” man – stops the load from over rotating only with a tag line attached on opposing sides! Helping as part of a team to make it safe to execute the planned lift.
If you want the highest Lorry Loader qualification currently available in the UK, alongside DCPC hrs as well, contact Steve : steve@smctrainingservice.co.uk or call 07870 901167 to discuss your training requirements.



